Changes in the Onset of Spring in the Western United States
Click here for recent article from the Bulletin of the American Meteorological Society:
Cayan, D.R., S.A. Kammerdiener, M.D. Dettinger, J.M. Caprio, and D.H. Peterson, 2001. Changes in the Onset of Spring in the Western United States. Bulletin of the American Meteorological Society, Vol. 82, No. 3, 399-415.In the above paper, fluctuations in spring climate in the western United States over the last 4-5 decades are described by examining changes in the blooming of plants and the timing of snowmelt-runoff pulses. The two measures of spring's onset that are employed are the timing of first bloom of lilac and honeysuckle bushes from a long-term cooperative phenological network, and the timing of the first major pulse of snowmelt recorded from high-elevation streams. Both measures contain year-to-year fluctuations, with typical year-to-year fluctuations at a given site of one to three weeks. These fluctuations are spatially coherent, forming regional patterns that cover most of the west. Fluctutations in lilac first bloom dates are highly correlated to those of honeysuckle, and both are significantly correlated with those of the spring snowmelt pulse.
Last update: 1 September 2006
2002 Phenology
2003 Phenology
2004 Phenology
2005 Phenology
2006 Phenology
Phenology Climatology
1999-2001 Streamflow TimingThe lilac and honeysuckle phenology was recently updated for 2002-2006. The images below show the information from the Western Phenological Network observations. (This network was initiated by Dr. J. Caprio and the data was collected by Dr. M. Dettinger and Dr. D. Cayan for the California Applications Program.) The images below show the departure from 1983-1994 average phenological stage date for the: leafing of first bud, all leafed, first bloom, peak full bloom and withered. The circles indicate lilac observations and the triangles indicate honeysuckle observations.
![]()
![]()
![]()
![]()
![]()
![]()
The streamflow timing for the years 2003-2005 and 1999-2002 are shown below. The streamflow timing is based on when half of the water year's flow is done at each USGS streamflow gaging station. The climatology for the timing is based on the 1959-1993 average streamflow. Red shows stations which reached the half-year-flow earlier than normal and blue shows stations which reached the half-year-flow later than normal. The streamflow timing uses the USGS Hydroclimate Data Network sites. The timing is based on centroids of water-year hydrographs and is calculated by Dr. M. Dettinger and Dr. D. Cayan for the California Applications Program.
![]()
![]()
| Lilac Site 5960 | Mt. Park, NM | Lat 32.57 | Lon 105.51 | ||
| Leafing of First Bud | All Leafed | First Bloom | Peak Bloom | Withered | |
| NR | NR | NR | NR | NR | |
| NR | NR | NR | NR | NR | |
| March 19 | March 25 | April 12 | April 28 | May 2 | |
| March 21 | March 27 | March 30 | April 14 | May 2 | |
| March 24 | April 7 | April 21 | April 26 | May 9 | |
| March 20 | March 25 | March 28 | Arpil 28 | May 2 | |
| March 23 | March 30 | April 21 | May 10 | May 21 | |
| April 1 | April 7 | April 15 | NR | May 3 |
| Lilac Site 4084 | Clark Fork, Idaho | Lat 48.05 | Lon 116 | ||
| Leafing of First Bud | All Leafed | First Bloom | Peak Bloom | Withered | |
| NR | NR | NR | NR | NR | |
| NR | NR | NR | NR | NR | |
| April 17 | April 25 | May 16 | May 23 | June 7 | |
| April 25 | April 28 | May 26 | June 2 | June 18 | |
| April 15 | April 20 | May 19 | May 28 | June 9 | |
| April 5 | NR | May 3 | May 17 | June 2 | |
| April 9 | April 16 | May 9 | May 17 | June 1 | |
| April 20 | April 27 | May 16 | May 24 | June 4 |
| Lilac Site 6008 | Neihart, MT | Lat 47.03 | Lon 110.47 | ||
| Leafing of First Bud | All Leafed | First Bloom | Peak Bloom | Withered | |
| May 8 | May 20 | June 1 | June19 | July 3 | |
| April 27 | May 2 | May 28 | June 8 | June 25 | |
| May 4 | May 9 | June 4 | June 20 | July 1 | |
| May 19 | June 1 | June 14 | June 24 | July 3 | |
| April 30 | May 12 | May 31 | June 18 | June 24 | |
| NR | NR | NR | NR | NR | |
| NR | NR | NR | NR | NR | |
| April 28 | May 10 | May 23 | June 5 | June 20 |
| Lilac Site 6559 | Monte Vista, CO | Lat 37.21 | Lon 106.3 | ||
| Leafing of First Bud | All Leafed | First Bloom | Peak Bloom | Withered | |
| NR | April 19 | May 15 | May 28 | June 12 | |
| April 18 | April 29 | May 11 | May 20 | June 1 | |
| April 8 | April 16 | May 12 | May 16 | June 2 | |
| April 10 | April 15 | May 8 | May 21 | June 5 | |
| April 2 | April 18 | May 14 | May 22 | June 10 | |
| NR | NR | NR | NR | NR | |
| NR | NR | NR | NR | NR | |
| April 16 | April 27 | May 14 | May 25 | June 7 |
| Lilac Site 6624 | Port Charles, WA | Lat 48.07 | Lon 123.26 | ||
| Leafing of First Bud | All Leafed | First Bloom | Peak Bloom | Withered | |
| NR | NR | NR | NR | NR | |
| NR | NR | NR | NR | NR | |
| March 20 | April 14 | NR | NR | NR | |
| March 25 | April 4 | May 2 | May 27 | June 8 | |
| March 13 | March 23 | April 18 | May 21 | May 31 | |
| NR | NR | NR | NR | NR | |
| Feb 10 | Feb 22 | March 31 | April 29 | May 18 | |
| March 5 | March 20 | April 19 | May 4 | May 25 |
| Lilac Site 6700 | Power, MT | Lat 47.39 | Lon 111.36 | ||
| Leafing of First Bud | All Leafed | First Bloom | Peak Bloom | Withered | |
| April 26 | May 12 | May 23 | May 29 | June 20 | |
| April 24 | May 2 | May 10 | May 24 | June 5 | |
| May 4 | May 9 | May 19 | May 24 | June 5 | |
| May 21 | May 28 | June 3 | June 7 | June 22 | |
| April 17 | April 26 | May 23 | June 1 | June 7 | |
| April 25 | May 14 | May 27 | June 11 | June 17 | |
| NR | NR | NR | NR | NR | |
| May 3 | May 12 | May 18 | May 22 | June 2 |
| Lilac Site 7727 | Royal City, WA | Lat 46.3 | Lon 119.4 | ||
| Leafing of First Bud | All Leafed | First Bloom | Peak Bloom | Withered | |
| NR | NR | NR | NR | NR | |
| NR | NR | NR | NR | NR | |
| March 14 | March 21 | April 10 | April 10 | April 17 | |
| March 17 | March 25 | April 12 | April 21 | May 4 | |
| April 2 | April 11 | NR | NR | April 30 | |
| March 19 | March 28 | April 9 | April 16 | NR | |
| March 4 | March 8 | April 4 | April 19 | April 29 | |
| Feb 22 | March 9 | April 18 | April 22 | May 15 |
NR=Data not recorded for that parameter